Search Advanced Close

To find product downloads simply click on one of the options above and then use the search form displayed to find all the documents associated with your search.

 

Search Advanced Close

To add products to your collection, simply search for products, click 'product details' and from the product page select 'add to my collection'. This can be found either within the product options panel or below the product image.

Search Advanced Close

Bathford Play Area, Bath

Bathford Council contracted HAGS to design and create a new play area that gives local children plenty of opportunities to play and socialise.

18/04/2019 08:47:00

Case Study Details

King George V Recreation Ground, Berkshire

Winkfield Parish Council contracted HAGS to create a brand new playground for the whole community to enjoy.

11/02/2019 13:01:00

Case Study Details

Kingsland Primary School, Wakefield

Kingsland Primary School is an outstanding rated SEN school in Wakefield, Yorkshire, which caters for children with a range of learning disabilities. They asked HAGS to design and build play areas for each of their two sites.

22/01/2019 15:42:00

Case Study Details

Get more inspiration from other installations all around the world

View All Case Studies
Search Advanced Close

Bathford Play Area, Bath

Bathford Council contracted HAGS to design and create a new play area that gives local children plenty of opportunities to play and socialise. The challenge was set for designers to come up with a well thought strategy to make best use of this existing narrow space where an old playground used to sit. The play area had to be low maintenance, provide play equipment for all abilities and have safety railings to distinguish it from the adjacent sports field.

We provided a range of equipment ensuring children would be kept entertained for hours. For the younger users (age 1-4) we provided the Zingo Nau, Zingo See Saw and a Zingo Bubble to integrate bright colours within the park. The Zingo product range promotes social interaction and development, as well as providing a challenging physical exercise.

For older children, the NRG Altitude 11B was chosen as a centrepiece and instinctively appeals to all children with a sense of adventure, providing challenges to get them moving so they never get bored. In addition, we’ve provided playground essentials such as the Olympic 2 seat swing with 2 cradle seats, a 2.4m Basket Swing and a Rota Roka to complement this play area. To encourage cognitive stimulation, we included the Crazy and Ball maze panels, Talk Tubes, 3 in a Row Panel and a ‘What Time Is It?’ panel.

Edward Webb, active member of the community & playground expert “The professionalism of HAGS and the understanding of what we are looking to achieve seemed to fit. There was a broad range of products and we wanted large challenging play units for the juniors. It was all installed and completed in the timeframe set out. We are all very pleased”.

We produced excellent results in partnership and consultation with the community under a limited financial package. The new play area has given children a breadth of new opportunities to get outside and play!

Explore the Bathford playground here

Location
Bathford, United Kingdom
Year Completed
2018

Related Products

HAGS UK

We believe play is one of the most transformative things humans do. It is essential for us to thrive. Our products enable and encourage everyone to be together and live more playful lives. This, in turn, promotes happier individuals and healthier communities.

United Kingdom

HAGS UK South
Clockhouse Lane East
Egham
Surrey
TW20 8PG Egham
United Kingdom

HAGS UK North
Waterfront Complex
Selby
North Yorkshire
YO8 8AP Selby
North Yorkshire

Follow Hags:

View Distributors